The Goal of the iMACS Date Viewer / Editor is to give iMACS Users the ability to view all of the dates within a project in a coherent manner, while enabling the ability to edit multiple dates at the same time.
The goal of phase 4 is to be anble to slide a group of dates in a nest by the same amount of time.
19) For roll-up (top of nested groups) and any events that have a start & end dates (phases), clicking on the edit icon will present a different interface
20) The "Sliding" interface has the ability to slide all editable dates within the phase by the number of days or weeks - Forward or backward. you can either select one of the preset forward or backward options which changes all of the editable dates by the amount selected
21) The option to select (Custom) for forward or backward selects the direction, and the quantity in the next screen
22) in the Custom select popup, you would select the quantity from a drop down from between 1 and 100
23) If you selected "Day(s)" then you would slide all editable dates forward or backward the number of days as set in (22)
24) If you select "Week(s)" then you would slide all editable dates forward or backward the number of weeks as set in (22)
25) If you select "Month(s)" then you would then change the month (leaving the date number the same), forward or backward the number of months as set in (22)
26) Once set, the "Confirm and Apply" would then make the changes.
27) A cancel button which when clicked would cancel any changes
28) A help button would take the user to any help documentation (future enhancement).
I think all phases of this project got killed. However, I am also looking for an API feed with all dates in iMACS so we can try to write our own master schedule/project planning tool as well. Perhaps Hector can help expedite something like this instead?
Is this available? We are looking for a report that shows all dates on a project so we can put it on a master schedule.